Roof Replacement Process: Complete Step-by-Step Guide
Understand every step of the roof replacement process. From initial inspection to final cleanup, here's what happens during your roofing project.
Roof Replacement Process: Complete Step-by-Step Guide
Understanding the roof replacement process helps you prepare and know what to expect. Here's your detailed walkthrough of every step from initial contact to final cleanup.
Phase 1: Initial Consultation & Inspection
Step 1: Schedule Free Inspection
What Happens:
- Contact Galvan Roofing Solutions
- Schedule convenient appointment
- No obligation to proceed
Timeline: Same day or next day availability
Step 2: Comprehensive Roof Inspection
What We Check:
- Overall roof condition
- Shingle condition and age
- Flashing and sealants
- Ventilation system
- Gutters and drainage
- Interior attic inspection
- Decking condition (if accessible)
- Structural integrity
Documentation:
- Photos of damage
- Detailed condition report
- Problem area identification
- Recommended solutions
Timeline: 30-60 minutes onsite
Step 3: Estimate Preparation
Included in Estimate:
- Detailed scope of work
- Material recommendations
- Color and style options
- Labor costs breakdown
- Permit fees
- Disposal costs
- Total investment
- Payment options
- Warranty coverage
- Project timeline
Timeline: Provided same day or within 24 hours
Phase 2: Planning & Preparation
Step 4: Material Selection
Decisions to Make:
- Roofing material type
- Shingle style and color
- Underlayment type
- Ventilation upgrades
- Additional features
We Provide:
- Material samples
- Color visualizer
- Style recommendations
- Performance comparisons
- Warranty information
Timeline: Can be immediate or take a few days
Step 5: Contract Signing
Contract Includes:
- Complete work scope
- Specific materials (brands/models)
- Total price breakdown
- Payment schedule
- Start and completion dates
- Warranty terms
- Change order process
Before Signing:
- Read thoroughly
- Ask questions
- Verify all details
- Understand warranties
- Keep your copy
Step 6: Permitting
What We Handle:
- Apply for city permits
- Submit building plans
- Schedule inspections
- Pay permit fees
- Ensure code compliance
Timeline: 3-7 business days for permit approval
Step 7: Material Ordering
What's Ordered:
- Shingles (calculated for waste)
- Underlayment
- Starter strips
- Ridge cap shingles
- Flashing materials
- Ventilation components
- Nails and fasteners
Timeline: 3-10 days for delivery
Step 8: Pre-Installation Preparation
Homeowner Tasks:
- Remove vehicles from driveway
- Clear items from garage
- Protect outdoor furniture
- Secure loose yard items
- Inform neighbors
- Arrange pet accommodations
Our Preparation:
- Delivery of dumpster
- Equipment setup
- Safety measures
- Property protection
Timeline: 1 day before installation
Phase 3: Roof Removal
Step 9: Old Roof Tear-Off
Process:
- Remove all old shingles
- Strip off old underlayment
- Remove old flashing
- Expose entire roof deck
- Load debris into dumpster
What to Expect:
- Loud noise (hammering, scraping)
- Vibration throughout house
- Dusty conditions
- Nails on ground (magnetic sweep performed)
Safety Measures:
- Roof edge protection
- Ground level barriers
- Safety harnesses for crew
- Tool security
Timeline: 4-12 hours depending on roof size
Step 10: Debris Cleanup
Our Process:
- Load all debris in dumpster
- Magnetic nail sweep
- Clear gutters
- Tarp coverage (if overnight)
- Inspect for hazards
Phase 4: Roof Deck Inspection & Repair
Step 11: Deck Inspection
What We Examine:
- All plywood/OSB decking
- Rotted or damaged boards
- Structural support integrity
- Spacing and fastening
- Ventilation adequacy
Common Findings:
- Water damage around chimneys
- Deterioration at roof valleys
- Weakened areas from leaks
- Improperly installed previous decking
Step 12: Deck Repairs
Typical Repairs:
- Replace damaged plywood sheets
- Secure loose boards
- Add additional support
- Repair structural framing
- Install proper spacing
Cost Implications: If extensive repairs needed:
- Discussed with homeowner
- Written approval required
- Additional cost explained
- Timeline impact reviewed
Timeline: 2-8 hours for typical repairs
Phase 5: New Roof Installation
Step 13: Drip Edge Installation
Purpose:
- Protects roof edges
- Directs water to gutters
- Prevents wood rot
- Provides clean edge
Material: Metal drip edge along all eaves and rakes
Step 14: Underlayment Application
Standard Process:
- Install synthetic underlayment
- Proper overlap for waterproofing
- Ice and water shield in valleys
- Extra protection around penetrations
Why It Matters:
- Secondary water barrier
- Protects during installation
- Extra leak protection
- Required by code
Step 15: Valley Treatment
Options:
- Closed valley (California style)
- Open valley with metal
- Woven valley
Our Recommendation: Ice and water shield with proper shingle layering for maximum protection
Step 16: Starter Strip Installation
Purpose:
- Provides edge protection
- Ensures proper shingle adhesion
- Prevents wind lift-off
- Creates clean starter course
Application: Along all eaves and rakes
Step 17: Field Shingle Installation
Process:
- Begin at eave, work upward
- Proper nail placement (6 nails per shingle)
- Correct overlap maintained
- Straight coursing
- Quality control checks
Precision Matters:
- Alignment verified
- Pattern maintained
- Exposure consistent
- Nail placement critical
Timeline: 1-2 days for typical roof
Step 18: Ridge Vent Installation
Benefits:
- Proper attic ventilation
- Reduces energy costs
- Extends shingle life
- Prevents moisture buildup
Installation:
- Cut ridge opening
- Install vent strips
- Cover with ridge cap
Step 19: Ridge Cap Installation
Purpose:
- Seals roof peak
- Protects ridge vent
- Provides finished appearance
- Prevents water infiltration
Method:
- Special ridge cap shingles
- Proper overlap
- Secure fastening
Step 20: Flashing Installation
Critical Areas:
- Chimneys: Step and counter flashing
- Skylights: Proper waterproof integration
- Walls: Step flashing where roof meets walls
- Plumbing vents: Boot replacement
- Roof valleys: Metal or woven
Quality Focus: Most leaks occur at flashing - we take extra care here
Step 21: Final Inspection
Our Quality Check:
- All shingles properly sealed
- Correct nail placement
- Flashing secure and sealed
- Ridge cap alignment
- No exposed nails
- Proper ventilation
- Clean job site
Phase 6: Cleanup & Final Steps
Step 22: Thorough Cleanup
Our Process:
- Remove all debris
- Magnetic nail sweep (multiple passes)
- Check gutters
- Inspect yard and driveway
- Haul away dumpster
- Final site inspection
We Find:
- Average 5-10 lbs of nails per job
- Multiple passes ensure safety
Step 23: City Inspection
What Happens:
- City inspector reviews work
- Checks code compliance
- Verifies proper installation
- Issues completion certificate
Timeline: Scheduled within 1-3 days of completion
Step 24: Final Walkthrough
With Homeowner:
- Inspect entire roof
- Review warranty information
- Explain maintenance tips
- Answer questions
- Verify satisfaction
- Provide documentation
Step 25: Documentation Provided
You Receive:
- Final invoice
- Warranty certificates
- Material documentation
- Inspection certificate
- Care and maintenance guide
- Future service contact info
Step 26: Final Payment
Payment Due:
- After completion verified
- Inspection passed
- Cleanup finished
- Your satisfaction confirmed
What to Expect Each Day
Day 1: Tear-Off
Morning:
- Crew arrives 7-8 AM
- Setup and safety measures
- Begin tear-off
Afternoon:
- Complete tear-off
- Deck inspection
- Identify needed repairs
- Tarp if necessary
End of Day:
- Debris contained
- Site secured
- Update on progress
Day 2: Repairs & Start Installation
Morning:
- Complete deck repairs
- Begin underlayment
- Install drip edge
Afternoon:
- Continue installation
- Valley treatment
- Begin shingle application
End of Day:
- Significant progress visible
- Site cleanup
- Overnight protection if needed
Day 3: Complete Installation
Morning:
- Continue shingle installation
- Work toward ridge
Afternoon:
- Ridge vent and cap
- Final shingles
- Flashing completion
End of Day:
- Installation complete
- Initial cleanup
- Quality inspection
Day 4: Cleanup & Inspection
Morning:
- Thorough cleanup
- Magnetic sweep
- Final quality check
Afternoon:
- Homeowner walkthrough
- Schedule city inspection
- Final documentation
Living in Your Home During Installation
Noise Levels
Expect:
- Loud hammering and impacts
- Equipment noise
- Worker communication
- Material movement
Quietest Times:
- Lunch break (usually noon-1 PM)
- Before 8 AM
- After 5 PM
Home Access
During Work:
- Okay to be home
- Stay indoors when possible
- Vibration throughout house
- Some dust may occur
Daily Routine
Minimal Disruption:
- Can use bathroom normally
- Kitchen accessible
- Work from home possible (but noisy)
- Internet/utilities unaffected
Pets and Children
Recommendations:
- Keep pets indoors
- Supervise children closely
- Avoid work area
- Nail hazard awareness
After Your Roof Is Complete
First Rain
What to Check:
- No visible leaks
- Water shedding properly
- Gutters flowing
- No interior signs of moisture
If Issues Found:
- Contact us immediately
- We respond quickly to concerns
- Warranty covers workmanship issues
Maintenance Tips
Annual Checks:
- Inspect for damaged shingles
- Clear debris from roof
- Clean gutters regularly
- Check flashing seals
- Look for granule loss
Professional Inspections:
- After severe storms
- Every 3-5 years
- Before selling home
Warranty Coverage
Our Workmanship Warranty:
- Covers installation defects
- Leak protection
- Specified period
- Transferable to new owner
Manufacturer Warranty:
- Material defects
- 25-50 years (material dependent)
- Registration may extend coverage
Questions During Process
Who Can I Contact?
Project Manager:
- Daily progress updates
- Address concerns
- Answer questions
- Coordinate schedule changes
Emergency Contact:
- For urgent issues
- After-hours emergencies
- Weather concerns
What If Weather Delays?
Our Policy:
- Safety first, always
- Will not work in unsafe conditions
- Keep you informed
- Reschedule promptly
- Protect your home
Unexpected Issues?
How We Handle:
- Inform you immediately
- Explain problem clearly
- Provide solution options
- Get your approval
- Document changes
Ready to Start Your Roof Replacement?
Galvan Roofing Solutions guides you through every step with:
- Clear communication
- Professional installation
- Quality materials
- Attention to detail
- Complete satisfaction